Upcoming Road Closure in Grapevine

70453104_10162631651780268_8964929861651005440_nNorthGate Constructors will conduct work on Bass Pro Drive from SH 26 to southbound SH 121 frontage road from Thursday night, September 19 starting at 8pm until 6am Friday morning, September 20. Then, the majority of their work will take place from 7am on Saturday, September 21 until 7am Sunday morning, September 22.

This work will require a full closure of Bass Pro Drive from SH 26 to the southbound SH 121 frontage road.

  • Eastbound traffic on Bass Pro Drive will be detoured to the hook ramp at the southbound SH 121 frontage road.
  • Westbound traffic on Bass Pro Drive will be detoured to the northbound SH 121 frontage, then to Sandy Lake Road.
  • Drivers will still be able to cross the Bass Pro Drive bridge in order to turn left on the southbound SH 121 frontage road.
  • The 7-Eleven and Embassy Suites Hotel will still have driveway access on northbound SH 26.
  • Bass Pro Shops will still have driveway access from the southbound SH 121 frontage road.

View a map that describes the closure and detour routes at bit.ly/2kjZu44. This second map shows the business driveway closures at bit.ly/2km5nxH.

Visit DFWConnector.com or text DFWC4 to 77222 for real-time updates.

Comments are closed.